Research Article
Corrosion Activity on CFRP-Strengthened RC Piles of High-Pile Wharf in a Simulated Marine Environment
Table 3
Dependence between potential and corrosion probability.
| Potential | Probability of corrosion |
| Ecorr −350 mV | Greater than 90% probability that reinforcing steel corrosion is occurring | −350 mV Ecorr −200 mV | Corrosion activity of the reinforcing steel in that area is uncertain | Ecorr −200 mV | 90% probability that no reinforcing steel corrosion is occurring (10% risk of corrosion) |
|
|