Research Article
Investigation into the Application of Construction and Demolition Waste in Urban Roads
Table 3
CBR test results of C&D waste.
| Penetration (mm) | CBR (%) | Average value (%) | Sample 1 | Sample 2 | Sample 3 |
| 2.5 | 38.6 | 24.1 | 41.4 | 34.7 | 5.0 | 49.3 | 35.7 | 44.0 | 43.0 |
|
|