Research Article
Performance of Geosynthetic-Reinforced and Cement-Fly Ash-Gravel Pile-Supported Embankments over Completely Decomposed Granite Soil: A Case Study
Figure 9
Temporal variation of fill height (a) and settlements (b) at the top of pile caps and the surrounding soils with time in the reinforced section.
(a) |
(b) |