Research Article

Study on Deformation and Stability of Rock-Like Materials Retaining Structure during Collaborative Construction of Super-Adjacent Underground Project

Table 3

Material parameters of rock-like material retaining structure.

ProjectMaterial of retaining structureMaterial of the first inner support

K0+600-K1+074 section of Gongchang Road ProjectDrilled grouting pileUnderwater concrete (C30)Shrinkage compensating concrete (C30)
Pressure jet grouting pileOrdinary portland cement (level P42.5)

Sun Yat-Sen University StationDiaphragm wallUnderwater concrete (C35)Concrete (C30)