Surface settlement monitoring.
| Items | Instruments | Number of Measured point | Frequency |
| Settlement | Optical level | 63 | The distance between the pipe jacking head and the monitoring section is 20 m, 1 times/d. | The cutter head is 15 m away from the monitoring section, 1∼2 times/d. | After the cutter head passes through the monitoring section, it is continuously monitored until the trend is stable, 1 times/d. |
|
|