Research Article

Research on Dynamic Response of Shallow Buried Tunnel Lining Constructed by Drilling and Blasting Method

Table 4

Comparison of simulated and measured values of peak particle velocity (with in situ stress).

PointR/mX velocity (cm/s)Error /%Y velocity (cm/s)Error /%Z velocity (cm/s)Error /%Resultant velocity (cm/s)Error /%
MSMSMSMS

1#1519.7521.377.5622.5419.8213.688.597.899.2726.1822.9913.87
2#2015.9017.428.6924.6127.7411.257.357.755.229.3127.875.18
3#258.167.3610.797.066.4110.188.248.042.3810.249.2710.44
4#309.588.976.8814.4415.607.4810.6010.993.5218.3117.295.92
5#3513.1214.9712.3016.7618.238.0511.7712.445.3923.3321.269.73

Note: R is the distance from the measurement point to the tunnel surface, M is the measured value, and S is the simulation value.