Research Article
Study on the Mechanical Properties and Design Parameters of Floor Slabs Waste Subgrade Filler
Figure 11
Construction process of the FSW subgrade: (a) roughly leveling with a bulldozer; (b) watering with a sprinkler; (c) static compaction and weak vibration.
(a) |
(b) |
(c) |