Research Article

[Retracted] Application of BIM and Internet of Things Technology in Material Management of Construction Projects

Table 3

Experimental data of location algorithm.

Serial numberActual coordinatesLANDMARC3-KNNImproved algorithm

1(0.0)(−0.73.2.50)(1.50.0.06)
2(0.50)(0.24.48.68)(3.03.48.53)
3(0, 100)(1.57.100.78)(1.20.102.22)
4(0.150)(0.72.149.24)(2.40,153.03)
5(83.0)(80.61, −1.15)(2.40,153.03)
6(0.150)(80.80.52.87)(86.28.50.08)
7(83.100)(86.21.97.33)(83.23.100.66)
8(83.150)(80.46.152.93)(84.12.150.25)