Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2015 (2015), Article ID 369767, 12 pages
http://dx.doi.org/10.1155/2015/369767
Research Article

Turnback Capacity Assessment and Delay Management at a Rail Transit Terminal with Two-Tail Tracks

1School of Transportation Engineering, Key Laboratory of Road and Traffic Engineering of the Ministry of Education, Tongji University, Shanghai 201804, China
2Institute of Railway Systems Engineering and Traffic Safety, Technical University of Braunschweig, Pockelsstraße 3, 38106 Braunschweig, Germany
3Department of Civil and Environmental Engineering, Jackson State University, P.O. Box 17068, Jackson, MS, USA

Received 25 December 2014; Revised 4 February 2015; Accepted 6 February 2015

Academic Editor: Anders Eriksson

Copyright © 2015 Zhibin Jiang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. D. S. Lee, Understanding capacity and performance of urban rail transit terminals [M.S. thesis], Massachusetts Institute of Technology, 2002.
  2. D. C. Gill, “Assessment of mass transit turn-back capacity using dynamic simulation models,” in Proceedings of the International Conference on Computers in Railways: Computers in Railways VII, pp. 1077–1086, Bologna, Italy, 2000.
  3. T. Parkinson and I. Fisher, “Rail transit capacity,” TCRP Report 13, Transportation Research Board, Washington, DC, USA, 1996. View at Google Scholar
  4. Kittelson & Associates, Parsons Brinckerhoff, KFH Group, Texas A&M Transportation Institute, and Arup, Transit Capacity and Quality of Service Manual, TCRP Report 165, Transportation Research Board, Washington, DC, USA, 3rd edition, 2013.
  5. N. van Oort and R. van Nes, “Impact of rail terminal design on transit service reliability,” Transportation Research Record, vol. 2146, pp. 109–118, 2010. View at Publisher · View at Google Scholar · View at Scopus
  6. M. T. Isaai, A. Kanani, M. Tootoonchi, and H. R. Afzali, “Intelligent timetable evaluation using fuzzy AHP,” Expert Systems with Applications, vol. 38, no. 4, pp. 3718–3723, 2011. View at Publisher · View at Google Scholar · View at Scopus
  7. M. Carey and I. Crawford, “Scheduling trains on a network of busy complex stations,” Transportation Research Part B: Methodological, vol. 41, no. 2, pp. 159–178, 2007. View at Publisher · View at Google Scholar · View at Scopus
  8. V. Cacchiani, A. Caprara, and P. Toth, “A Lagrangian heuristic for a train-unit assignment problem,” Discrete Applied Mathematics, vol. 161, no. 12, pp. 1707–1718, 2013. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  9. J. Zhibin, G. Jia, and X. Ruihua, “Circle rail transit line timetable scheduling using Rail TPM,” in Proceedings of the 12th International Conference on Computer System Design and Operation in the Railways and other Transit Systems (COMPRAIL '10), pp. 945–952, Beijing, China, September 2010. View at Publisher · View at Google Scholar · View at Scopus
  10. Y. Lee and C.-Y. Chen, “A heuristic for the train pathing and timetabling problem,” Transportation Research Part B: Methodological, vol. 43, no. 8-9, pp. 837–851, 2009. View at Publisher · View at Google Scholar · View at Scopus
  11. H. Niu and X. Zhou, “Optimizing urban rail timetable under time-dependent demand and oversaturated conditions,” Transportation Research Part C: Emerging Technologies, vol. 36, pp. 212–230, 2013. View at Publisher · View at Google Scholar · View at Scopus
  12. Ö. Yalçinkaya and G. Mirac Bayhan, “A feasible timetable generator simulation modelling framework for train scheduling problem,” Simulation Modelling Practice and Theory, vol. 20, no. 1, pp. 124–141, 2012. View at Publisher · View at Google Scholar · View at Scopus
  13. A. Carrel, R. G. Mishalani, N. H. M. Wilson, J. P. Attanucci, and A. B. Rahbee, “Decision factors in service control on high-frequency metro line: importance in service delivery,” Transportation Research Record, vol. 2146, pp. 52–59, 2010. View at Publisher · View at Google Scholar · View at Scopus
  14. Z.-B. Jiang, F. Li, R.-H. Xu, and P. Gao, “A simulation model for estimating train and passenger delays in large-scale rail transit networks,” Journal of Central South University, vol. 19, no. 12, pp. 3603–3613, 2012. View at Publisher · View at Google Scholar
  15. J. D. Schmöcker, S. Cooper, and W. Adeney, “Metro service delay recovery: comparison of strategies and constraints across systems,” Transportation Research Record, no. 1930, pp. 30–37, 2005. View at Google Scholar · View at Scopus
  16. A. Puong and N. H. M. Wilson, “A train holding model for urban rail transit systems,” in Computer-Aided Systems in Public Transport, vol. 600 of Lecture Notes in Economics and Mathematical Systems, pp. 319–337, Springer, Berlin, Germany, 2008. View at Google Scholar
  17. H. Wang, N. Zhao, and L. Chen, “An integrated capacity evaluation method for CBTC-system-equipped urban rail lines,” Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, pp. 1–12, 2013. View at Publisher · View at Google Scholar
  18. T. Dollevoet, D. Huisman, L. Kroon, M. Schmidt, and A. Schöbel, “Delay management including capacities of stations,” Transportation Science, pp. 1–19, 2014. View at Publisher · View at Google Scholar
  19. V. Cacchiani, D. Huisman, M. Kidd et al., “An overview of recovery models and algorithms for real-time railway rescheduling,” Transportation Research, Part B: Methodological, vol. 63, pp. 15–37, 2014. View at Publisher · View at Google Scholar · View at Scopus
  20. M. Flamini and D. Pacciarelli, “Real time management of a metro rail terminus,” European Journal of Operational Research, vol. 189, no. 3, pp. 746–761, 2008. View at Publisher · View at Google Scholar · View at Scopus
  21. C. Mannino and A. Mascis, “Optimal real-time traffic control in metro stations,” Operations Research, vol. 57, no. 4, pp. 1026–1039, 2009. View at Publisher · View at Google Scholar · View at Scopus
  22. J. Törnquist and J. A. Persson, “N-tracked railway traffic re-scheduling during disturbances,” Transportation Research Part B: Methodological, vol. 41, no. 3, pp. 342–362, 2007. View at Publisher · View at Google Scholar · View at Scopus