Research Article
Site Selection of Waste-to-Energy (WtE) Plant considering Public Satisfaction by an Extended VIKOR Method
Table 10
The 2-tuples
, and
of public assessments.
| | A1 | A2 | A3 | A4 | A5 |
| | Δ(0.2577) | Δ(0.5248) | Δ(0.1843) | Δ(0.7054) | Δ(0.8060) | | Δ(0.0913) | Δ(0.1874) | Δ(0.0636) | Δ(0.2355) | Δ(0.2405) | | Δ(0.1372) | Δ(0.6236) | Δ(0.0000) | Δ(0.9049) | Δ(1.0000) |
|
|