Site Selection of Waste-to-Energy (WtE) Plant considering Public Satisfaction by an Extended VIKOR Method

Table 2

Quantitative criteria value of alternatives.

CriteriaYangzhouXinyiXuzhouQingtianHaiyan

a1 (CNY/kW)3.923.543.783.493.56
a2 (CNY/kW)0.120.090.050.080.13
b1 (km)2823351318
b2 (kJ/kg)53475528569254715196
C13 (km)4.15.66.24.53.5
C14 (km)9.512.5141211.5
C15 (m)170260100320180
C21 (CNY/m2)9990958075
C23 (m)16501867224521742350
C31 (CNY/kWh)0.650.650.650.650.65
C13 (km)8585856565
d1 (m2/a)3382034750376403156035460
d2 (t/a)7364973890746537315873986
d3 (t/a)2584022560286302256025890
e3 (t/a)6138062690641086135062970