Research Article

Model Test Study on the Influence of Train Speed on the Dynamic Response of an X-Section Pile-Net Composite Foundation

Table 2

Train speed and frequency.

Actuator frequencyTwo peak period (s)Corresponding train speed (km/h)Two trough periods (s)Carriage cycle (s)

180.0561600.1730.556
220.0452000.1420.455
280.0362500.1110.357
330.0303000.0950.303
390.0263500.0800.256