Research Article
Short Cantilever Rock Beam Structure and Mechanism of Gob-Side Entry Retaining Roof in Reuse Period
Figure 1
Roadway layout of two coal working faces. (a) In the stage of gob-side entry retaining; (b) in the reuse process of gob-side entry retaining.
(a) |
(b) |