Advances in Materials Science and Engineering / 2016 / Article / Tab 3

Research Article

Prediction of Chloride Diffusion in Concrete Structure Using Meshless Methods

Table 3

The initiation period of corrosion by different methods (at 31 nodes).

Initiation period (year)MWLSEFGFEMExact solutions

is a constant4.504.554.604.67
is a time-dependent function6.006.356.40

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.