Research Article

Effect of Rubberized Bitumen Blending Methods on Permanent Deformation of SMA Rubberized Asphalt Mixtures

Table 8

Three-stage models for control and rubberized asphalt mixtures at 400 kPa.

Temperature (°C)Asphalt mixture specimen Primary stage Secondary stageTertiary stage
ModelEnd pointPredicted strain, µsMeasured strain, µsModelSlopeEnd point (FN)Predicted strain, µsMeasured strain, µsModel

40°CControl = 4088N0.294946925074.9325185.27 = 25074.93 + 15.1()15.1aaaa
TB = 3889.3N0.284597927589.8428045.16 = 28029.93 + 6.995()6.995aaaa
CB = 3740.9N0.2823103526551.7926216.27 = 26138.10 + 7.977()7.977aaaa

50°CControl = 5146.9N0.30716924860.3325046.38 = 24860.33 + 39.439()39.43982950890.0751849.49 = 50890.1 + 2789.6()
TB = 6176.7N0.252336927442.0927549.52 = 27442.09 + 17.677()17.677aaaa
CB = 4100.3N0.298359927626.2627859.29 = 27626.26 + 14.184()14.184aaaa

60°CControl = 5014.9N0.35256021235.4121252.78 = 21235.41 + 135.17()135.1720640970.2341464.50 = 40970.2 + 2401.6()
TB = 4351.6N0.34846518632.3618767.02 = 18632.36 + 117.42()117.4224539767.9640711.57 = 39768.0 + 1333.2()
CB = 3909.8N0.34617417341.8617532.57 = 17341.86 + 93.494()93.49435343426.68644529.37 = 43426.7 + 2097.8()

Not found at the end of 1800 cycles.