Optimization of Life Cycle Extension of Asphalt Concrete Mixtures in regard to Material Properties, Structural Design, and Economic Implications
Table 6
The results of the rehabilitation, maintenance, and user costs.
| Variant | Variant scenario | Rehabilitation 5th year | Rehabilitation 10th year | Rehabilitation 15th year | Rehabilitation 20th year |
| Rehabilitation action | — | Overlay 36 mm | Overlay 52 mm | Overlay 62 mm | Overlay 71 mm | Investment cost | 0 | 69 084 | 99 788 | 118 978 | 136 249 | Maintenance cost | 846 938 | 858 066 | 941 350 | 1 162 456 | 1 581 330 | Road agency cost | 846 938 | 927 150 | 1 041 138 | 1 281 434 | 1 717 579 | Road user costs | | | | | | Vehicle operating cost | 8 316 431 | 9 995 382 | 11 689 165 | 13 594 956 | 16 045 362 | Travel time cost | 822 241 | 973 891 | 1 125 826 | 1 290 801 | 1 569 194 | Total road user cost | 9 138 673 | 10 969 273 | 12 814 991 | 14 885 757 | 17 614 555 | Life cycle length | 20 | 25 | 30 | 35 | 40 | Optimization index | 0 | 475 857 | 461 871 | 461 920 | 483 303 | CBA | | | | | | NPV | — | 20 333 | 26 739 | 14 527 | 1 438 | IRR | — | 48.30% | 155.10% | 139.40% | 99.50% | PP | — | 6 | 11 | 15 | 20 |
|
|