Research Article

Shear Characteristics of Cement-Stabilized Sand Reinforced with Waste Polyester Fiber Fabric Blocks

Figure 13

Cement hydration process and integration of fabric blocks with the cement-stabilized sand matrix: (a) curing for 3 days; (b) curing for 14 days; (c) mesomorphology after integration of fabric blocks with the cement-stabilized sand matrix.
(a)
(b)
(c)