Research Article
Shear Characteristics of Cement-Stabilized Sand Reinforced with Waste Polyester Fiber Fabric Blocks
Figure 13
Cement hydration process and integration of fabric blocks with the cement-stabilized sand matrix: (a) curing for 3 days; (b) curing for 14 days; (c) mesomorphology after integration of fabric blocks with the cement-stabilized sand matrix.
(a) |
(b) |
(c) |