Procedure number | Procedure instructions |
|
1 | Initial state (construction of the diaphragm wall, isolation piles, anchor cable, and shield tunnel and reading initial values) |
2 | Soil excavation to −133 mm depth |
3 | Construction of sloping and the first-layer anchor cable |
4 | Soil excavation to −266 mm depth |
5 | Soil excavation to −400 mm depth |
6 | Construction of the second-layer anchor cable |
7 | Soil excavation to −533 mm depth |
8 | Soil excavation to −667 mm depth |
9 | Construction of the third-layer anchor cable |
10 | Soil excavation to −800 mm depth |
11 | Soil excavation to −933 mm depth |
12 | Soil excavation to −1000 mm depth |
13 | Waiting for 24 h after completion of excavation |
14 | Loading foundation slab and weights of 1.2 kN |
15 | Loading weights of 2.4 kN |
16 | Loading weights of 3.6 kN |
17 | Loading weights of 4.8 kN |
18 | Loading weights of 6.0 kN |
19 | Loading weights of 7.2 kN |
20 | Loading weights of 8.4 kN |
|