Research Article

Feasibility of Stabilized Zn and Pb Contaminated Soils as Roadway Subgrade Materials

Figure 6

Photos showing the cracks developed on the surfaces of the stabilized soils after water-soaking tests (curing time of 27 d and binder content of 6%). (a) KMP Zn0Pb0. (b) KMP Zn1.5. (c) KMP Pb2. (d) KMP Zn1.5Pb2. (e) PC Zn0Pb0. (f) PC Zn1.5. (g) PC Pb2. (h) PC Zn1.5Pb2.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)