Research Article

Feasibility of Stabilized Zn and Pb Contaminated Soils as Roadway Subgrade Materials

Table 4

Parameters obtained from the simulated PSD curves of KMP and PC stabilized soils (6% cement, 28 days of curing) based on peak analysis.

Specimensa1 (mL/g)a2 (mL/g)μ1μ2σ1σ2R2

Zn0Pb0 (KMP)0.0010.0280.0190.3910.0070.3280.90
Zn0.5 (KMP)0.0010.0270.0190.3950.0070.3200.91
Zn1.0 (KMP)0.0010.0310.0220.4050.0070.3250.93
Zn1.5 (KMP)0.0020.0330.0280.4230.0120.2860.92
Zn1.5Pb2 (KMP)0.0020.0440.0340.4400.0130.3390.93
Pb2 (KMP)0.0010.0330.0220.4160.0080.3270.93
Zn0Pb0 (PC)0.0010.0260.0210.4110.0090.2650.90
Zn0.5 (PC)0.0010.0280.0240.4350.0100.2790.94
Zn1.0 (PC)0.0010.0330.0280.4480.0070.3220.94
Zn1.5 (PC)0.0020.0440.0310.4610.0120.3230.92
Zn1.5Pb2 (PC)0.0030.0480.0400.4850.0190.2800.91
Pb2 (PC)0.0020.0370.0220.4770.0090.3100.94

n = number of peaks in the fitted PSD curves; a1 = volume of intra-aggregate pore; a2 = volume of interaggregate pore; μ1 = mean diameter of intra-aggregate pore; μ2 = mean diameter of interaggregate pore; σ1 and σ2 = standard deviation; R = correlation coefficient.