Research Article
A Prediction Model for Concrete Cracks due to Chloride-Induced Corrosion
Figure 6
Specimen detecting test. (a) Corrosion rate = 2.6%. (b) Corrosion rate = 3.2%. (c) Corrosion rate = 3.6%. (d) Corrosion rate = 4.5%.
(a) |
(b) |
(c) |
(d) |