Research Article

A Prediction Model for Concrete Cracks due to Chloride-Induced Corrosion

Figure 6

Specimen detecting test. (a) Corrosion rate  = 2.6%. (b) Corrosion rate  = 3.2%. (c) Corrosion rate  = 3.6%. (d) Corrosion rate  = 4.5%.
(a)
(b)
(c)
(d)