Research Article

Reliability Assessment Based on GO Method of Metro Traction System

Table 3

Reliability parameters of operators 15 (16–18) and 23 (24–26).

Operator numberFailure rate (h−1)Average maintenance time (h)Working probabilityFailure probability

15 (16–18)60.999825840.00017416
23 (24–26)10.15398320.999452710.00054729