Research Article

Reliability Assessment Based on GO Method of Metro Traction System

Table 5

Reliability parameters of operators 1 (2) and 19 (20–22).

Operator numberFailure rate (h−1)Average maintenance time (h)Working probabilityFailure probability

1 (2)240.99970.0003
19 (20–22)60.999850730.00014927