Research Article
Reliability Assessment Based on GO Method of Metro Traction System
Table 6
Reliability parameters of operators 3 (4) and 5 (6).
| Equivalent signal flow number | Failure rate (hā1) | Average maintenance time (h) | Working probability | Failure probability |
| 3 (4) | | 19.4730539 | 0.9996748 | 0.0003252 | 5 (6) | | 18.3732058 | 0.9996160 | 0.0003840 |
|
|