Research Article
Studying Bump at Bridge Approach of Short Subgrade with Oblique Prestressed Concrete Overlaying Asphalt Layer
Table 5
Control criteria for differential settlement of short subgrade at different speeds when 8 m L ≤ 30 m.
| ||||||||||||||||||||||||||||||||||||||||
= the longitudinal slope difference of bridge pavement. = the maximum allowable longitudinal slope difference of slab. = the maximum allowable longitudinal slope difference of bridge pavement and slab. |