Research Article

Evaluation of the Existing Solar Energy and Rainwater Potential in the Total Roof Area of Buildings: Izmit District Example

Table 1

Comparison of Ilısu HEPP and most suitable alternative solution.

Ilısu hydro power systemParabolic gutter systemPower tower system

Maximum annual power generation (GWh)383338333833
Installed power (MW)12001070675.94
Covered area (km2)331 (Dam Lake)36.8256.58
Cost (Euro)1.2 billion306.2 million610.14 million