Research Article

Temperature Load Parameters and Thermal Effects of a Long-Span Concrete-Filled Steel Tube Arch Bridge in Tibet

Figure 6

(a) Temperature changes of the in-pipe concrete on August 7, 2018. (b) Temperature changes of the in-pipe concrete on January 18, 2019.
(a)
(b)