Abstract

This paper investigates the performance of a top-down deep excavation in soil-rock composite stratum. The behavior of the excavation bracing system, consisting of ground anchors and end-suspended piles, has not been well understood due to the lack of relevant research. Based on the observed data of a typical deep excavation case history for the May Fourth Square Station in Tsingtao, China, the characteristics of the horizontal and vertical pile displacements, ground surface settlements, building settlements, axial forces in ground anchors, earth pressure, and pore water pressure during excavation were analysed. Two-dimensional finite element simulations were carried out to further explore the deformation and internal force responses of end-suspended piles and to capture the effects of pile diameter, embedded depth, and rock-socketed depth on the horizontal displacement and bending moment distributions along the pile shaft. It was found that the pattern of the vertical pile displacements could be categorized into three types: rapid settlement, slow settlement, and rapid heave. The magnitudes of the ground and building responses can be well controlled within allowable limits by combining the top-down method with the adopted bracing system. Among the investigated parameters, pile diameter is dominant in affecting the horizontal pile displacement. The primary influence zone for pile bending moment varies, depending on the parameters. It is recommended that a combination of top-down method, ground anchors, and end-suspended piles be adopted for restraining excavation deformation and lowering construction costs of similar deep excavations in soil-rock composite stratum.

1. Introduction

Excavations are generally made for constructing metros, mass rapid transit systems, high-rise buildings, underground oil tanks, and other facilities. With the rapid development of economy and urbanization, excavations are going deeper and becoming larger in scale. This highlights the significance of investigating the performance of deep excavations, especially for them that are under unsatisfactory geological conditions [14] or them that are in close proximity to constructed facilities or infrastructures [58].

In the past several decades, extensive studies have been conducted to investigate the performance of deep excavations in terms of excavation-induced deformation and internal force characteristics of retaining walls and bracing structures [911], ground movements [1214], and response of preexisting structures that are adjacent to the excavations [1517]. These studies are based mainly on numerical simulations [18, 19], empirical or semiempirical methods [20, 21], analytical solutions [22, 23], in situ monitoring data analysis [24, 25], centrifuge or scaled model testing [26, 27], and machine learning [28, 29]. Among the commonly adopted methods, numerical simulations usually predict better results for excavation-induced wall displacements than for ground movements and can consider the effects of excavation stages and nonlinearity of soil behavior [30, 31]. In addition, as the design of the bracing system for a deep excavation is still heavily dependent on semiempirical and empirical methods [32, 33], an update on the well-documented deep excavation case histories by in situ monitoring data analysis will be beneficial for relevant researchers, designers, and engineers by providing timely feedback helpful for lowering the risk for construction and design.

The performance of deep excavations varies according to excavation geometry and scale, geological conditions, excavation method, type of retaining structure, and other factors. Tan et al. [34] found that for a long and narrow deep excavation, the minimum wall deflections occurred near the excavation corners while the maximum near the middle span of the excavation. This can be attributed to the corner strengthening effect which has also been investigated by Lee et al. [35] and Ou and Shiau [36]. The geological conditions significantly affect the design of the excavation bracing system and thus the construction duration and cost. A great deal of efforts were made to understand the performance of deep excavations in various types of soils including soft clays [37], sand [38], granite [39], sand covered karst [40], and loess [41].

The commonly adopted excavation methods mainly include the bottom-up method, the top-down method, and the semitop-down method. Due to its advantages of short excavation duration, low construction cost, and easy operation, the bottom-up method was used for constructing many metrostations or basements in soft soils [42, 43]. To avoid the risk of excessive ground movements and tremendous disturbance to the existing structures or facilities involved in the bottom-up method, the top-down method is frequently adopted in deep excavations in congested urban environment [4446]. Recently, an innovative excavation method termed semitop-down method, which is superior to the abovementioned two methods, has been used in several excavations in downtown Shanghai [47]. In addition, as for the type of retaining structure for a deep excavation, flexible retaining systems (e.g., soldier pile walls and sheet pile walls) and stiff diaphragm walls are prevalent and have been extensively investigated. Some observed data has proved that the empirical or semiempirical prediction methods based on flexible retaining systems may overestimate the ground movements and wall deflections corresponding to stiff diaphragm walls [4851]. Despite the plenty of studies on the performance of deep excavations, the performance of deep excavations braced with ground anchors and end-suspended piles in soil-rock composite stratum has not been well understood.

The end-suspended piles have been successfully applied for supporting deep excavations in the soil-rock composite stratum in many cities in China such as Tsingtao, Guangzhou, Shenzhen, and Wuhan where the bedrock is relatively shallowly buried. Due to the difficulty of constructing cast-in-place pile in hard rock stratum and the limitation of project budget, the bottom of end-suspended pile in this case is above the final excavation bottom. This feature differentiates the deep excavation braced with end-suspended piles from that braced with conventional piles. In order to further expedite the application of end-suspended piles in deep excavations and optimize their design, a deeper understanding of the performance of deep excavations braced with end-suspended piles and the effects of many important parameters is necessary. In addition, the soil-rock composite stratum is characterized by soft soil in the upper position and hard rock in the lower position. Because of this, blasting excavation may be required and careful design of the excavation bracing system is necessary for reducing the construction cost and ensuring safety and stability.

In this paper, a case history of top-down deep excavation braced with ground anchors and end-suspended piles in the soil-rock composite stratum was reported. The observed performance of the deep excavation in terms of horizontal and vertical pile displacements, ground surface settlements, building settlements, axial forces in ground anchors, earth pressure, and pore water pressure was analysed. Moreover, a parametric study based on two-dimensional (2D) finite element method was conducted to capture the effects of pile diameter, embedded depth, and rock-shoulder width on the deformation and internal force characteristics of end-suspended pile.

2. Case History Description

2.1. Engineering Background

Figure 1 shows a plan view of the considered deep excavation case history. The May Fourth Square (MFS) Station, serving as an interchange station for Lines M2 and M3 of Tsingtao Metro Line 3, is located at the intersection of the HK Road and the Shandong Road. The MFS Station, consisting of 5 passageways and 2 fire-fighting entrances, has a length of 277.8 m and a width of 44.8 m. The cover depth of the Station ranges between 3.7 and 6.9 m. The 20 m deep excavation was bounded by the 401 Hospital dormitory to the north, by the Tsingtao Center and its hotel and office buildings to the south, by 2 brick buildings and the Shangri-La Hotel (15–19 stories) to the west, and by the Yihe International Building to the east.

Figure 2 shows a profile of Section B-B as illustrated in Figure 1. The excavation, made using the top-down method, was braced with end-suspended piles and both prestressed ground anchors (i.e., YMG1, YMG2, and YMG3) and general ground anchors (i.e., MG1–MG6). The vertical and horizontal spacings between two ground anchors were, respectively, 1.9 and 1.8 m. The borehole diameter and the inclination angle with respect to the horizontal direction for a ground anchor were, respectively, 0.15 m and 15°. The diameter of the end-suspended piles was 0.8 m on the inner side row and 1.0 m on the outside row. The length of the end-suspended piles ranged between 6.5 and 8.0 m.

The subsurface conditions at the site consist of a miscellaneous fill (MF) layer of 2 m in thickness overlying a sequence of granite layers. The granite layers, in descending order, are heavily weathered granite (HWG) layer, moderately weathered granite (MWG) layer, and slightly weathered granite (SWG) layer. The groundwater mainly consists of pore water and bedrock fissure water which is near to the structural belt. A detailed geotechnical investigation including in situ and laboratory tests was performed to determine the soil parameters for this case history. The variations of several important parameters, which are modulus of elasticity, Poisson’s ratio, unit weight, cohesion, and angle of internal friction, with depth below ground surface, are plotted in Figure 3. Evidently, the modulus of elasticity, cohesion, and angle of internal friction for the SWG and MWG layers are significantly greater than that for the HWG and MF layers.

2.2. Field Instrumentation

A plan view of the field instrumentation layout is presented in Figure 1. Figure 2 gives a profile of the instrumentation. The instrumented items included horizontal and vertical pile displacements, ground surface settlements, building settlements, axial forces in ground anchors, earth pressure, and pore water pressure. The horizontal and vertical pile displacements were monitored using inclinometers. Level instruments were used to monitor the ground surface settlements and building settlements with a minimum spacing of 2.0 m. The monitoring points for building settlements were created by drilling on the building corners using percussion drilling and then installing L-shaped iron nails. The axial forces in ground anchors were monitored using steel stress meters welded to the main reinforcement of the ground anchors. The earth pressure was monitored using the earth pressure cells, which were installed on the outside of the end-suspended piles. The elevations of the earth pressure cells corresponded to that of the steel stress meters. Monitoring of pore water pressure was automatically performed throughout the excavation stages using the vibrating-wire piezometer cells located in the water pipe boreholes close to the inclinometers. All instrumentation was installed and calibrated at least two weeks before the beginning of any construction work at the site. Accuracy of the observed data was periodically checked during the excavation.

2.3. Construction Stages

Table 1 summarizes the main construction activities as well as their duration at the site. Work began with the excavation of the soil above the top slab. After this, the columns and the top slab with a thickness of 1 m were constructed. The concrete filled steel tubular columns were of 0.8 m in external diameter, 0.02 m in wall thickness, and 7.8 m in spacing. When the top slab was completed, backfilling of the excavated miscellaneous fill and construction of the pavement were conducted to restore the traffic. Excavation then proceeded as described in Table 1. The inner side row of the end-suspended piles extended to a depth of 8.5 m below ground surface, whereas the outside row penetrated to a depth of 15 m below ground surface. As the construction activities proceeded, 8 levels of ground anchors were installed to brace the end-suspended piles and the excavation. Ground anchors at the first level consisted of YMG1 and YMG2, and they were preloaded with approximately 60% of the design ground anchor load. The second and third levels of ground anchors were preloaded, respectively, with a load of 100 and 310 kN.

3. Observed Performance during Excavation

3.1. Horizontal and Vertical Pile Displacements

The magnitude of the horizontal displacements of the end-suspended piles affects not only the stability of the pile but also the ground movements surrounding the excavation. Figure 4 presents the subsurface distributions of horizontal pile displacements at CX13 for several construction stages as detailed in Table 1. It can be indicated that when the excavation proceeded to 2 m below ground surface, the horizontal pile displacement was trivial with its maximum being less than 3 mm. This could likely be attributed to the fact that the excavation depth was small and the excavation exposure duration was short. As the excavation depth increased, the horizontal pile displacements throughout the entire pile length significantly increased. The maximum horizontal pile displacement occurred initially at the pile top at the first two excavation stages. After the excavation stage proceeding to 7, the maximum horizontal pile displacement occurred at the pile tip. Although the embedded depth of the end-suspended piles into the MWG layer was only 2 m, the restraining effect of the embedded section was sufficient to ensure the stability of the end-suspended pile during excavation.

Figure 5 shows the time histories of the vertical displacements atop the end-suspended piles. It can be found that the pattern of the vertical pile displacements could be categorized into three types: rapid settlement, slow settlement, and rapid heave. The rapid settlement pattern occurred before the backfilling of the excavated MF layer above the top slab. Throughout the pattern of slow settlement, the maximum vertical pile displacement of -12.28 m in magnitude was achieved. When the excavation depth proceeded to be greater than 15.5 m, the pattern of rapid heave appeared due to the pronounced stress relaxation effect caused by excavation. The maximum heave of the end-suspended piles was 5.68 mm.

3.2. Ground Surface Settlements

Figure 6 shows the time histories of the ground surface settlements along monitoring lines of DC13, DC23, and DC39. It can be indicated that the rate and the magnitude of the ground surface settlement was much greater at DC23-02 than at other surface settlement monitoring points. Before July 19, 2012, the daily surface settlement was approximately -0.4 mm, and this value decreased to be -0.1 to -0.2 mm as time went on. Up to August 31, 2012, the maximum surface settlement was reached with a magnitude of -17.68 mm. In addition, neither the daily surface settlement nor the accumulated surface settlement exceeded the design value and the alarm value.

Figure 7 shows the time histories of the ground surface settlements along monitoring lines of DC05, DC06, DC07, and DC30. It can be noticed that the ground surface settlements were continuous during the excavation with the daily surface settlement being about -0.2 mm. The rapid settlement phase was replaced by the slow settlement phase after the achievement of the final excavation depth. The maximum surface settlement was -14.88 mm, which was also less than the design and the alarm values. The relatively small ground surface settlement induced by a top-down deep excavation benefited from the bracing effect of the top slab. Therefore, in soil-rock composite stratum, the top-down method is preferable to the bottom-up excavation method.

3.3. Building Settlements

To analyse the excavation induced building settlements, the Yihe International Building, which was, respectively, 24 and 63 m apart from the 4# and the 3# passageways, was selected as the representative. Figure 8 shows the time histories of the Yihe International Building settlements. It is noted that the building settlements occurred at the 8 monitoring points increased in a wave-shaped manner with proceeding the construction date. Several rebounding trends on the time history curves are observable. This phenomenon may be attributed to the preloading of the ground anchors. Among the considered monitoring points, the JC04-1, nearest to the excavation, settled most, with the maximum settlement being -10.71 mm.

3.4. Axial Forces in Ground Anchors

Figure 9 shows the time histories of the axial forces in ground anchors. It can be recognized that the variation of the axial forces in ground anchors was rather complex in the early stage of the excavation. After the backfilling of the soil above the top slab, the axial force in ground anchor MG5 decreased gradually. In the meantime, the axial forces in ground anchors YMG3, MG4, and MG2 remained almost unchanged, while the axial forces in ground anchors YMG4, MG1, MG3, and MG6 increased slightly. For the investigated case history, a combination of ground anchors and end-suspended piles has provided satisfactory bracing effect.

3.5. Earth Pressure

Figure 10 shows the time histories of the earth pressure at monitoring points TY03-01, TY03-02, TY03-03, TY04-01, and TY04-02. It is shown that the earth pressure at TY03-02 and TY03-03 increased before the 25th construction days and then decreased with proceeding the construction days. However, unlike the variational characteristics of earth pressure at TY03-02 and TY03-03, the earth pressure at TY03-01, TY04-01, and TY04-02 consistently decreased with proceeding the construction days. The decreasing trend of the earth pressure could be attributed to the increase in the horizontal displacements of the ground surrounding the excavation.

3.6. Pore Water Pressure

Figure 11 shows the time histories of pore water pressure at various monitoring points. As is shown, the variational rate of the pore water pressure was slow at the selected monitoring points except the KY04-03. At KY04-03, the pore water pressure initially decreased at a relatively high velocity until the 20th construction day, after which the decreasing velocity was reduced greatly. According to the principle of effective stress, the relationship among total stress , effective stress , and pore water pressure can be described by . When the total stress is kept constant, a negative correlation exists between effective stress and pore water pressure . During the station excavation, the unloading effect will lead to a reduction in the pore water pressure within the ground. Simultaneously, the effective stress increases, which will compress the soil, resulting in a repeated increase of the pore water pressure at some monitoring points.

4. Finite Element Analysis

4.1. Meshing and Boundary Conditions

The symmetry of the considered deep excavation case history was considered in the finite element analysis. Figure 12 shows the meshing of the finite element analysis model. As the length of the excavation in the longitudinal direction is much larger than that in the transverse direction, a 2D plane strain finite element model was established. According to the previous engineering experience and related numerical analysis results, the primary zone of excavation influence is characterized by a width of 2 to 4 times the final excavation depth and by a depth of 2 to 3 times the final excavation depth. Therefore, the dimensions of the established finite element analysis model were of 115 m in horizontal direction and 75 m in vertical direction. Roller supports were applied to the vertical boundaries to restrain the horizontal displacements, while pin supports were applied to the bottom of the mesh to restrict the displacements in all directions.

4.2. Constitutive Models and Parameters

In the numerical analysis, the Mohr-Coulomb model was used to describe the stress-strain behavior of the soils. Table 2 summarizes the soil parameters for the finite element analysis. The parameter, incremental stiffness , is a special option in PLAXIS [52] for the Mohr-Coulomb model. It is activated for inputting the soil stiffness as a function of cover depth, which is beneficial for revising the exaggerated basal heave involved in the application of this soil constitutive model. Considering the fact that the stiffness of the bracing structure and the station structure is much larger than that of the soils, the linear elastic model was adopted to simulate the constitutive behavior of the structures.

The beam element was used to represent the end-suspended piles and steel pipe columns. In the numerical analysis, the real piles and columns of circular cross-section were transformed to beams of a rectangular cross-section. This transformation is based on the principle of equivalent flexural rigidity which has the form of where is the diameter of pile or column, is the spacing between two piles or columns, and is the equivalent thickness of the transformed beams.

A manipulation of Equation (2) yields

By using Equation (2), the equivalent thicknesses for the end-suspended piles, slabs, and steel pipe columns were derived which are, respectively, 0.73, 1, and 0.42 m.

The anchorage sections of the prestressed ground anchors as well as the ground anchors in the granite layers were simulated using the geogrid element. For the geogrid element, the modulus of elasticity was calculated by where is the cross-sectional area of the cable or bolt, is the cross-section area of grout, is the modulus of elasticity for the cable or bolt, and is the modulus of elasticity for the grout.

4.3. Deformation and Internal Force Characteristics of End-Suspended Piles

Figure 13 presents the variation of the horizontal displacement of the end-suspended pile with a construction stage. It can be indicated that at the excavation depth of 2 m, the deformation of the pile was characterized by cantilever type. In other words, the horizontal pile displacement peaked at the pile top, while it was almost zero below the rock-socketed position. An observable increase in the horizontal pile displacement below the rock-socketed position occurred when the excavation depth reached 5 m. At the excavation depth of 20 m, the maximum horizontal pile displacement of 0.33 mm appeared at 2.25 m above the rock-socketed position. As a whole, because of the effect of the prestressed ground anchor attached to the pile top, the maximum horizontal displacement of the end-suspended pile, which occurred at the pile top, was achieved at the construction stage 2.

The variation of the horizontal displacement at end-suspended pile tip with construction stage is shown in Figure 14. It can be noted that the horizontal pile tip displacement increased with an increase in the excavation depth. During the installation of the ground anchor YMG4, a significant change of the horizontal pile tip displacement occurred, indicating that the feet-lock prestressed ground anchor played an important role in controlling the horizontal pile tip displacement. A dramatic increase in the horizontal pile tip displacement was also observed when the rock within the range of pile embedment depth was excavated. This demonstrated that the restraining effect of the rock beneath the pile tip on the pile tip was noteworthy, although the embedment depth of the pile into the MWG layer was only 2 m. Moreover, it can also be indicated from Figure 14 that a significant reduction in the horizontal displacement at the pile tip occurred between construction stages 8 and 12. This may be attributed to the application of a relatively large prestress of 310 kN to the ground anchors of YMG4.

Figure 15 shows the variations of the bending moment and shear force in the end-suspended pile with the construction stage. It is shown that the effect of proceeding the construction stage on the internal forces within the upper 3 m of the pile was negligible. This was because the first level of the ground anchor attached to the pile top had restrained the horizontal pile displacement. As the maximum bending moment in the pile occurred between the first-level ground anchor and the temporary support, the prestress in the lower levels of ground anchors had a negligible effect on the maximum bending moment. Moreover, with a further increase in the excavation depth, the position at which the maximum negative bending moment occurred moved down gradually. When reaching the final excavation depth, the maximum negative bending moment appeared at 0.75 m below the rock-socketed position. Additionally, the shear force in the rock-socketed position decreased with increasing the excavation depth.

Figure 16 shows the variations of the earth pressure applied on the active side of the end-suspended pile with the distance to the rock-socketed position. It can be indicated that at the excavation depth of 2 m, the soil behind the pile above the excavation face did not reach the active limit state due to the small magnitude of the horizontal pile displacement. Below the excavation face, with an increase in the cover depth, the horizontal pile displacement decreased gradually; and therefore, the active earth pressure applied on the pile gradually approached the earth pressure at rest. At the rock-socketed position (i.e., interface between soil and rock), the earth pressure equaled to nearly zero. This could be attributed to the fractures generated in the rock due to the detaching of the pile from the rock. Overall, both the distribution pattern and the magnitude of the earth pressure applied on the pile by the finite element analysis method agreed well with the results of the Rankine earth pressure theory. The discrepancy between them was distinct only at the interface of the soil and rock.

Figure 17 shows the variations of the earth pressure applied on the passive side of the end-suspended pile with the distance to rock-socketed position. The figure indicates that both the distribution pattern and the magnitude of the earth pressure obtained by the finite element method differed greatly from that predicted by the Rankine passive earth pressure theory. Therefore, it can be inferred that the limit equilibrium method may be not applicable for the design of the end-suspended pile. Therefore, it is recommended that the soil springs be adopted to simulate the passive earth pressure applied on the end-suspended pile. Moreover, it can be also indicated that the earth pressure distribution curves were similar before and after the excavation of the bedrock, and they peaked at the bedrock surface.

The variation of the maximum earth pressure in the rock-socketed position with excavation depth is presented in Figure 18. From the variational curve, it can be indicated that the maximum earth pressure decreased almost linearly with an increase in the excavation depth until reaching construction stage 8. After completing the excavation of the slightly weathered granite, the rate of the decreasing trend for the maximum earth pressure became lower. This was partially attributed to the installation of the ground anchor YMG4. However, the installation of the ground anchor YMG4 did not compensate fully for the loss of the passive earth pressure induced by the excavation of the rock shoulder.

5. Discussion

5.1. Effects of Pile Diameter

Figure 19 shows the effects of pile diameter on the horizontal displacement and bending moment of the end-suspended pile. It can be indicated that for most parts of the pile shaft, the horizontal displacements decrease with an increase in pile diameter from 0.8 to 1.1 m. However, the effects of the pile diameter on horizontal displacements are trivial at a distance to rock-socketed position of approximately 4 m or being less than 0 m. From Figure 19(b), it is noted that the primary area of the effects of the pile diameter on the bending moment ranges between 1 and 4 m of the distance to the rock-socketed position. Moreover, within the primary area, the bending moment increases with increasing pile diameter; and the rate of increase in the bending moment decreases with increasing pile diameter.

The variational percentages of the maximum positive horizontal displacement and maximum bending moment of end-suspended pile at the considered magnitudes of pile diameter are presented in Figure 20. Note that the variational percentages are calculated based on the results at the pile diameter of 0.8 m. It is shown that the decreasing trend of the maximum positive horizontal displacement with increasing pile diameter gradually becomes mitigatory. A reduction of approximately 30% in the maximum positive horizontal displacement appears when the pile diameter increases from 0.8 to 1 m. This demonstrates the benefit of controlling excavation deformation by increasing the pile diameter. However, it is inevitable that work amount will be greatly increased with increasing pile diameter. In addition, Figure 20 also shows that with an increase in the pile diameter, the maximum bending moment increases accordingly. An increase of approximately 20% in the maximum bending moment occurs when the pile diameter increases from 0.8 to 1 m.

5.2. Effects of Embedded Depth

Figure 21 presents the effects of embedded depth on the horizontal displacement and bending moment of the end-suspended pile. The variational percentages of the maximum positive horizontal displacement and the maximum bending moment at various magnitudes of embedded depth are shown in Figure 22. It is indicated that for the considered magnitudes of embedded depth, all the maximum horizontal displacements uniformly occur at a distance to rock-socketed position of 2.25 m, which is located between the first row of ground anchors and the temporary support. With an increase in the embedded depth, the horizontal displacement for the upper part of the end-suspended pile decreases at a relatively low rate. From Figure 22, it can be indicated that when the embedded depth increases from 1 to 2 m, the maximum positive horizontal displacement of the end-suspended pile decreases by 14%. The position at which the maximum bending moment occurs is also located between the first row of ground anchors and the temporary support. An increase in the embedded depth affects only the bending moment for the part of pile shaft below the temporary support. Therefore, the effects of embedded depth on the maximum bending moment are very inappreciable. This phenomenon can be also observed in Figure 22 which shows a reduction in the maximum bending moment of merely 3.2% when the embedded depth increases from 1 to 2 m.

5.3. Effects of Rock-Shoulder Width

Figure 23 shows the effects of rock-shoulder width on the horizontal displacement and bending moment of the end-suspended pile. It can be indicated that the occurrence position of the maximum horizontal displacement gradually moves upward with an increase in the rock-shoulder width. After reaching the rock-shoulder width of 1.1 m, the occurrence position of the maximum horizontal displacement remains unchanged. This demonstrates that the rock-shoulder with a width of 1.1 m can provide sufficient earth resistance for restraining the tip of the end-suspended pile. An increase in the rock-shoulder width has a relatively big effect on the horizontal displacement of the pile shaft below the temporary support. However, the horizontal displacement of the pile shaft above the temporary support remains nearly unchanged as the rock-shoulder width increases. Figure 24 shows the variational percentages of the maximum positive horizontal displacement and the maximum bending moment of the end-suspended pile at various magnitudes of rock-shoulder width. It can be noted that a reduction of merely 6% in the maximum positive horizontal displacement occurs when the rock-shoulder width increases from 0.5 to 1.1 m. Moreover, when the rock-shoulder width increases from 0.5 to 1.5 m, an increase of approximately 4.7% in the maximum bending moment can be achieved.

6. Conclusions

The performance of top-down deep excavation braced with ground anchors and end-suspended piles in a soil-rock composite stratum was investigated by analysing the observed data for a typical case history in Tsingtao, China, and performing a series of finite element simulations. A parametric analysis based on finite element simulations was also made to capture the effects of pile diameter, embedded depth, and rock-shoulder width on the horizontal displacement and bending moment of the end-suspended pile. The conclusions drawn from this study can be summarized as follows. (i)The deformation of end-suspended pile during excavation is of cantilever type. Due to the limited socketed force provided by the reserved rock-shoulder with a relatively small width, the horizontal pile displacement is considerable at the rock-socketed position. The position at which the maximum bending moment in pile occurs gradually moves downward as proceeding the construction stages. With an increase in the excavation depth, the horizontal displacements for the socketed section of the end-suspended pile increase accordingly(ii)Magnitudes of pile top settlements, ground surface settlements, and building settlements induced by top-down deep excavation braced with ground anchors and end-suspended piles are generally less than 20 mm, indicating that the top-down excavation method has a beneficial effect on restraining the excavation-induced settlements in a soil-rock composite stratum(iii)Within the primary influence zone of pile diameter ranging between 1 and 4 m of the distance to the rock-socketed position, the bending moment increases while the rate of increase in the bending moment decreases with increasing pile diameter. An increase in the embedded depth affects only the bending moment for the part of pile shaft below the temporary support. The horizontal displacement of the pile shaft above the temporary support remains nearly unchanged as the rock-shoulder width increases(iv)A combination of the top-down method with a bracing system consisting of ground anchors and end-suspended piles is recommended for deep excavations in a soil-rock composite stratum, as it can effectively restrain the deformation of the excavation. Moreover, by implementing this combination, the construction costs can be significantly lowered due to the reduced rock-socketed depth of the piles as well as to the reduced difficulty of construction, when compared to the conventional excavation bracing system

Data Availability

The data used to support the findings of this study are available from the corresponding author upon request.

Conflicts of Interest

The authors declare that there are no conflicts of interest regarding the publication of this paper.