Abstract

On the basis of the analysis of the cumulative production growth curve model, the model variables are adjusted, and the Taylor formula is expanded on the adjusted model. Then the appropriate expansion order n is selected, and the new model for the prediction of cumulative production is established. Furthermore, the error of the new model is discussed, and the model can theoretically achieve any given precision. The model can forecast oil and gas production, cumulative production, and recoverable reserves. Finally, the example analyses show that the greater the order number (n) is, the smaller the error between the prediction data and the actual data and the greater the correlation coefficient become. Compared with other models, the results show that the model has higher prediction accuracy and wider application range and can be used to forecast the production of oil and gas field.

1. Introduction

For an engineer of oil and gas reservoir, oil and gas production, and recoverable reserves, prediction is an essential work, which is an important basis for oil and gas field planning and development, production allocation optimization, and daily dynamic analysis. The method of decline analysis is widely used which is based on system theory, fuzzy mathematics, information theory, grey theory, and cybernetics. Many studies had been focused on the production decline analysis. In 1945, Arps [1] proposed 4 types of declines: exponential, hyperbolic, harmonic, and ratio decline basing on decline trend observed in the field. Then Arps [2] (1956) simplified the proposed decline curves. In 1972, Gentry [3] studied the characteristics of each type of decline and then obtained two dimensionless equations and discussed the decline index in detail. Fetkovich [4] (1971 and 1980) constructed type curves combining the transient rate and the pseudo-steady-state decline curves and derived single-phase flow from material balance and Darcy law. Experts in China have also put forward some decline curves. In this respect, Yu and Chen are the representatives, and these are also empirical statistical formulas. In 1996, based on the distribution of in statistics, Chen [5] deduced the original Weng's prediction model systematically, obtained the generalized model for predicting oil and gas field production, maximum annual production, recoverable reserves, and their occurrence time, and proposed the linear trial and error method for solving the model. In 1997, Hu [6] first proposed the inverse tangent differential distribution model according to the theory of production decline of Arps. The production decline theory of Arps is further enriched. In 1999, Yu [7] presented two new types of decline curve and and then demonstrated the validity of these two curves. On the basis of Weng's cycle model and Weibull's model, Song et al. [8] (2000) introduce a new model which can not only predict the oil and gas field production in the future, but also fix the time that the maximum annual production occurs in the recoverable cycle and put forward a geometric progression method to calculate parameters. In 2003, Li [9] improved Hu's antitangent differential distribution method, which made it more extensive. In 2004, Ding et al. [10] proposed a new model for predicting oil and gas field performance based on Weng's model, logistic model, and Chen-Hu prediction model. The model can predict recoverable reserves, cumulative production, and production. By changing the parameters of the model, the model can be simplified into logistic model and Chen-Hu prediction model. In 2005, Zhu et al. [11] put forward a generalized production decline equation , which can be transformed into Arps equation, tangent differential distribution production decline equation, and improved Hu decline equation by changing the parameters. In 2007, Yao et al. [12] analyzed oil and gas production in Tarim by the grey correlation degree method, and the influencing elements with higher relational degree were selected to establish nonlinear prediction model using grey theory GM(1,N) to solve the model. The model is utilized to predict the oil production and achieved good results. There are many other kinds of oil and gas field production prediction methods, such as experience trend method, historical matching method [13](Zhou, 2012), mathematical model method [1416](Saraiva et al., 2014; Li et al., 2013; Keven and Roland, 2007), the unit proven reserve ratio method, analogy method [17](Charpentier and Cook, 2010), and intelligent prediction method [18](Weiss et al., 2002).

In general, the reliability of prediction results not only depend on the accuracy of the information and data, the user's quality, and work experience, but also depend on the accuracy of the selected prediction methods and the established mathematical model. Among these factors, the most primary factor is the established mathematical model. Without appropriate forecasting method, it is impossible to have good prediction results. As we all know, Taylor formula is a very important formula in advanced mathematics and has been popular in prediction research and application [1923]. Based on the analysis of the cumulative production growth curve model, the model variables are adjusted and the adjusted model is expanded by the Taylor formula. Next, a new model for the prediction of cumulative production is established, which can be used to predict oil and gas production, cumulative production rate, and recoverable reserves.

2. Methods

2.1. Problem Description

The prediction of oil and gas production and recoverable reserves is a very important task in reservoir work. It is an important content in compiling oil and gas field development plan, designing oil and gas field development (adjustment) plan, and analyzing oil and gas field development performance. Although there are many production prediction models for oil and gas fields now and these models have been widely used in the prediction of oil or gas production and recoverable reserves, but there are still some limitations. In order to make each model complement each other, this article established a new model for predicting oil and gas field production, cumulative production, recoverable reserves, maximum annual gas production, and its occurrence time.

2.2. The Prediction Model Based on Taylor Expansion Formula

The cumulative growth curve models in the literatures are listed in Table 1.


Prediction modelparameters

(Chen, et al., 1996) [24]: cumulative production of oil and gas fields, (oil), (gas)
: Recoverable reserves of oil and gas fields, (oil), (gas)
: development years, a;
: model undetermined constant


(Hu, et al., 1997) [25]
: cumulative production of oil and gas fields, (oil), (gas)
: Recoverable reserves of oil and gas fields, (oil), (gas)
: development years, a;
: model undetermined constant


(Yu, 2000) [26]
: cumulative production of oil and gas fields, (oil), (gas)
: Recoverable reserves of oil and gas fields, (oil), (gas)
: development years, a;
: model undetermined constant

(Ding et al. 2004) [10]: cumulative production of oil and gas fields, (oil), (gas)
: Recoverable reserves of oil and gas fields, (oil), (gas)
: development years, a;
: model undetermined constant

These formulas of cumulative growth curve yield prediction model are based on the experience and then the formulas of oil field development are summarized, so the undetermined parameters in the formula must be attained through the actual data when solving the cumulative production and recoverable reserves.

Considering time t is an incremental variable in the cumulative production model, when tends to infinity (), cannot be infinitely small. In order to facilitate the expansion of Taylor, we choose as the variable; the above models turn to be the forms as follows:The Taylor expansion formula of the function at the point is as follows:where and is a value between and .

When tends to infinity, obviously tends to zero. The cumulative production model with adjusted variables is expanded by the Taylor formula:where , , , and is the recoverable reserve () when the original growth curve model as t tends to infinity. Selecting the appropriate expansion order n, (3) could be used to predict the recoverable reserves.

Error Analysis. Using the expansion order n of to calculate the cumulative production approximately, the error is

For a fixed n, when , if , the error estimation equation is

Given any precision and choosing the appropriate time , as long as , the order can be achieved. This implies that, for any precision, a suitable expansion order can be found to ensure that the new prediction model is strictly true.

When t tends to infinity, is a higher order infinitesimal of . Therefore, the remainder can be written as

When , , ignoring the infinite small terms, the above equation can be written aswhere are undetermined parameters. Equation (7) can be solved by regression analysis, and then it can be used to predict the cumulative production.

Whenignoring the infinite small items, the above equation can be written as where are undetermined parameters. They can be solved by regression analysis, and then it can predict the cumulative production.

Letthen (9) can be written as

When different values are taken by , the error sum of square between predicted data and the actual data can be written as

For obtaining the optimal coefficient a, b, c, d, we must make a minimum error E; that is,

Let the partial derivatives of (13) with respect to a, b, c, d be zero; then we can get the linear equation set (14).

The solution of (14) is the value of the coefficient a, b, c, d, and so on, until we find the appropriate order n in (15) to make the predicted results well in accordance with the actual data. Therefore, the following equation can estimate cumulative production and recoverable reserves.where are undetermined parameters.

For the calculation of production, the method in literature (Ding et al., 2004) can be adopted. That is,If the actual data is daily production, we can predict cumulative daily production and daily production by (15) and (16).

2.3. Model Validation

When using our proposed formula (15) to predict accumulative production and recoverable reserves, we need to solve the unknown parameters in the formula, and the regression analysis method is used here. In order to determine the appropriate , regression analysis was carried out to obtain the parameters according to the actual data, which obtained the only certain Taylor expansion. To further validate the applicability of this model, we use the Taylor expansion formula of the production prediction model proposed in the paper [27].

2.3.1. Logistic Production Prediction Model

Logistic production prediction model is . We choose as the variable, (the cumulative production of year); Taylor expansion formula is We can ignore the infinite item:

For , , the recoverable reserves are equal to the cumulative production at this time.

The model parameters are obtained by self-regression in [19], and the results are , , , (considering the influences on the parameter , taking the average); the linear regression between the cumulative yield and time is used to obtain the slope of the straight line. Bring in actual data: , , .

We choose as the variable; the Logistic production prediction model turns to be the forms When n=2, n=3, n=4, n=5, and n=7, Taylor expansion formula is used to predict the cumulative production in different years, and the results are shown in Table 7.

2.3.2. G&H Production Prediction Model

To further verify the effectiveness of this model, we use the proposed model in [28], which can be simplified as the famous Gompertz model and the Herbert model. So the model is referred to as the G&H yield prediction model. G&H production prediction model is (the cumulative production of t year). We choose as the variable: We can ignore the infinite item:For , . The model parameters are obtained by linear regression in [28], and the results are , , .

We choose as the variable; the G&H production prediction model turns to be the formsWhen n=2, n=3, n=4, n=5, and n=7, Taylor expansion formula is used to predict the cumulative production in different years, and the results are presented at Table 8.

2.3.3. Comparison

Table 9 is the prediction results of the proposed Taylor expansion model (T) and the prediction results of Taylor expansion of logistic model (L) and G&H model (G&H). We compare a smaller order of n=2 and larger order of n=7. The comparison of actual data and predicted data of cumulative production are shown in Figures 1 and 2.

Figure 1 or Figure 2 can explain that the Taylor model predicts more accurately when compared with the logistic model and Gompertz model and the Herbert model. Comparing Figure 1 and Figure 2, we can conclude that the obtained results by Taylor prediction model are closer to the real value as the increase of Taylor expansion order. Table 9 is the error of prediction value and the real value. Next we give the definition of error. Let and be prediction value and real value, respectively. The error is defined by . Tables 9 and 10 show that the effect of prediction reduced over time when Taylor's order is certain and that the effect of prediction increased over time when the time is certain. Using the proposed Taylor expansion model (T) and the Taylor expansion of logistic model (L) and G&H model (G&H) to predict recoverable reserves, the error is around 5% in the first 10 years. This forecast error is reasonable, because different models exit minor difference. Although the effect of the latter is not particularly good, on the whole, we can draw the conclusion that the proposed prediction model based on Taylor expansion is feasible.

2.3.4. Correlation Analysis

The results of the three kinds of Taylor expansion of different models are compared when n=2 and n=7, respectively, and the results are represented by a matrix. The elements of the matrix represent the correlation coefficient of sequence X and sequence Y, the result is a 22 matrix, the diagonal elements represent X and Y autocorrelation, and nondiagonal elements represent the correlation coefficient of X and Y and Y and X, two of which are equal. The results are as follows:

The correlation coefficient matrices A, C present the prediction results of Taylor expansion prediction model and the Taylor expansion of logistic model, respectively. The correlation coefficient matrices B, D present the prediction results of Taylor expansion prediction model and the Taylor expansion of G&H model, respectively. According to the correlation coefficient matrix, the values become closer to 1. The cumulative production predicted by this method is consistent with the other two Taylor expansion models. It shows that the prediction model established in this paper is practical and reliable.

2.4. The Novelty of Model

Compared with other models in the literatures, the Taylor model has two distinct advantages.

(1) It can be applied to forecast the production of oil and gas fields. We can predict cumulative annual production and daily production by (15) and (16). And as time goes on, of (15) closes to 0 and results predicted by the model are more accurate. As the expansion order n increases, the prediction error becomes smaller and smaller, and the correlation coefficient between the predicted value and the actual value becomes larger and larger.

(2) Taylor model is a power function in nature. Compared with other models which are containing exponential function, it is faster in calculation speed and occupies less CPU, so it is more suitable for oil and gas production prediction.

3. Result and Discussion

3.1. Application of Prediction Model

To demonstrate the scalability of our model, the experiments were conducted on oilfield block of Hudson oilfield in Tarim China and Bavly oilfield in this part. The Bavly oilfield was discovered in 1946 and developed in 1950, which is one of the outer edge water-flooding sandstone oilfields in the Soviet Union, developed with keeping the formation pressure. The oil bearing area of the oilfield is 118 km2. The block was formally put into development in August 2000. The block's month cumulative production from January 2004 to July 2013 was calculated by our model and comparison and analysis were made between the prediction data by models in literatures and the actual data.

3.2. Numerical Results
3.2.1. Bavly Oilfield

The practical data and the prediction data of the cumulative production and production are shown in Figures 3 and 4 and Tables 5 and 6, respectively. Recoverable reserves are shown in Table 2 and the correlation coefficient of the prediction data and the practical data is shown in Table 3.


expansion ordern=4n=5n=7n=20n=50

recoverable reserves1252.07195310282.4599166452.9330266452.9330266452.93301


expansion ordern=2n=3n=4n=5n=7

correlation coefficient0.99790.99980.9999170990.9999443990.999970846

It follows from Tables 2 and 3 that the prediction data is very close to the practical data of the field development. With the increase of the expansion order n, there are no major changes for the prediction data of recoverable reserves, and the correlation coefficient is gradually approximating close to 1. Furthermore, these data are also quietly close to the prediction data in the literatures.

3.2.2. An Oilfield Block of Hudson Oilfield in Tarim China

The comparison of actual data and predicted data of month cumulative production and production are shown in Figures 5, 6, and 7 and the comparison of recoverable reserves is shown in Table 4.


n=5n=6in ref. Chen et al. 1996
in ref. Ding et al. 2004

correlation coefficient0.9999510.9999850.9998650.999898

recoverable reserves (million tons)4001.0153111.26230003000


yeart(a)cumulative production (million tons)
practical dataprediction data n=2prediction data n=3prediction data n=4prediction data n=5prediction data n=7

19591224502318.7892478.59962454.58652446.31772450.3951
19601328302836.99062793.90212822.87062843.02662827.0884
19611432003281.82533171.06073194.6723195.88393206.4152
19621535653667.84293556.22273561.48283549.85243562.595
19631639054005.98483923.45113913.40513900.86633902.4385
19641742354304.6374261.28054243.09334236.5464228.1552
19651845354570.33524565.76954546.18074547.23284535.8497
19661948054808.24844836.82964820.71784827.71194819.6946
19672050655022.51825076.25995066.46595076.38445074.9303
19682153055216.50215286.68975284.29895294.0475299.0852
19692255155392.95075471.01275475.75695482.87755492.0571
19702356655554.13875632.09345642.73535645.72415655.6689
19712457855701.96395772.62095787.27745785.64995793.0743
19722558955838.02165895.04695911.44145905.66295908.201
19732659955963.66336001.56676017.21886008.5686005.3019
19742760856080.04096094.12536106.48786096.89776088.6276
19752861706188.14266174.43386180.98876172.88956162.2078
19762962406288.82086243.99186242.31536238.49136229.7177
19773063006382.81486304.10996291.91426295.38046294.4093
19783163506470.76896355.9336331.09096344.98976359.0873


yeart(a)annual production (million tons)
actual dataprediction data n=2prediction data n=3prediction data n=4prediction data n=5prediction data n=7

195912390158.789418.5996394.5865386.3177390.3951
196013380518.2016315.3025368.2841396.7089376.6933
196114370444.8347377.1586371.8014352.8573379.3268
196215365386.0176385.162366.8108353.9685356.1798
196316340338.1419367.2284351.9223351.0139339.8435
196417330298.6522337.8294329.6882335.6797325.7167
196518300265.6982304.489303.0874310.6868307.6945
196619270237.9132271.0601274.5371280.4791283.8449
196720260214.2698239.4303245.7481248.6725255.2357
196821240193.9839210.4298217.833217.6626224.1549
196922210176.4486184.323191.458188.8305192.9719
197023150161.188161.0807166.9784162.8466163.6118
197124120147.8252140.5275144.5421139.9258137.4054
197225110136.0577122.426124.164120.013115.1267
197326100125.6417106.5198105.7774102.905197.1009
19742790116.377692.558689.26988.329783.3257
19752885108.101780.308574.500975.991873.5802
19762970100.678269.55861.326665.601867.5099
1977306093.99460.118149.598956.889164.6916
1978315087.954151.823139.176749.609364.678


yeart(a)cumulative production (million tons)
practical dataprediction data n=2prediction data n=3prediction data n=4prediction data n=5prediction data n=7

19591224502500.62500.6 2500.62500.62500.6
19601328302843.12845.22845.22845.22845.2
19611432003186.23199.33199.53199.13198.9
19621535653520.63556.63557.33555.03553.6
19631639053841.43911.63913.33906.33900.9
19641742354146.34260.54263.94248.14233.2
19651845354434.44600.84606.34576.84544.1
19661948054706.04930.74938.84890.34828.6
19672050654961.55249.05260.35187.15083.2
19682153055201.75555.35570.35466.85305.6
19692255155427.55849.45868.35729.55494.9
19702356655639.96131.36154.55975.55650.8
19712457855839.86401.36429.06205.45773.9
19722558956028.16659.76692.16420.15865.2
19732659956205.66907.06944.26620.35926.1
19742760856373.2714357185.66807.05958.4
19752861706531.67369.87417.06981.15963.7
19762962406681.47586.37638.67143.45944.1
19773063006823.37793.67851.07294.75901.4
1978316350 6957.97992.28054.57435.95837.5


yeart(a)cumulative production (million tons)
practical dataprediction data n=2prediction data n=3prediction data n=4prediction data n=5prediction data n=7

19591224502465.92465.9 2465.92465.92465.9
19601328302864.32865.02864.92864.92864.9
19611432003250.63255.33254.03253.63253.5
19621535653618.83631.63626.73624.73624.2
19631639053966.53911.53979.63973.23971.4
19641742354293.04333.84310.84296.64291.7
19651845354598.84658.14620.34593.64583.2
19661948054884.44964.94908.54864.44845.1
19672050655152.152454.75176.35109.95077.8
19682153055402.25528.35425.15331.35282.3
19692255155636.35786.85656.15530.25459.8
19702356655855.76030.95870.85708.45612.0
19712457856061.56261.76070.45867.65740.6
19722558956254.76480.06256.26009.55847.6
19732659956436.56686.66429.36135.65934.6
19742760856607.76882.46590.86247.46003.4
19752861706769.27068.16741.86346.46055.7
19762962406921.77244.46883.06443.76093.1
19773063007065.97411.97015.26510.66117.0
1978316350 7202.47571.27139.36571.86128.7


yeart(a)cumulative production (million tons)
TLG&HTLG&H
practical dataprediction data n=2prediction data n=7

19591224502318.7892500.62465.92446.31772500.62465.9
19601328302836.99062843.12864.32843.02662845.22864.9
19611432003281.82533186.23250.63195.88393198.93253.5
19621535653667.84293520.63618.83549.85243553.63624.2
19631639054005.98483841.43966.53900.86633900.93971.4
19641742354304.6374146.34293.04236.5464233.24291.7
19651845354570.33524434.44598.84547.23284544.14583.2
19661948054808.24844706.04884.44827.71194828.64845.1
19672050655022.51824961.55152.15076.38445083.25077.8
19682153055216.50215201.75402.25294.0475305.65282.3
19692255155392.95075427.55636.35482.87755494.95459.8
19702356655554.13875639.95855.75645.72415650.85612.0
19712457855701.96395839.86061.55785.64995773.95740.6
19722558955838.02166028.16254.75905.66295865.25847.6
19732659955963.66336205.66436.56008.5685926.15934.6
19742760856080.04096373.26607.76096.89775958.46003.4
19752861706188.14266531.66769.26172.88955963.76055.7
19762962406288.82086681.46921.76238.49135944.16093.1
19773063006382.81486823.37065.96295.38045901.46117.0
19783163506470.7689 6957.9 7202.46344.98975837.56128.7


TLG&HTLG@H
yeart(a)prediction data n=2prediction data n=7

1959120.0535560.0206530.006490.0015030.0206530.00649
1960130.002470.0046290.012120.0046030.0053710.012332
1961140.025570.0043130.0158130.0012860.0003440.016719
1962150.0288480.0124540.0150910.0042490.0031980.016606
1963160.025860.0162870.0157490.0010590.001050.017004
1964170.0164430.0209450.0136950.0003650.0004250.013388
1965180.0077920.0221830.0140680.0026970.0020070.010628
1966190.0006760.0206040.0165240.0047270.0049120.008345
1967200.0083870.0204340.0171960.0022480.0035930.002527
1968210.0166820.0194720.0183220.0020650.0001130.004279
1969220.022130.0158660.0219950.0058250.0036450.010009
1970230.019570.0044310.0336630.0034030.0025070.009356
1971240.0143540.0094730.0477960.0001120.0019190.007675
1972250.0096660.0225780.0610180.0018090.0050550.008041
1973260.0052270.0351290.0736450.0022630.0114930.010075
1974270.0008150.0473620.08590.0019550.0208050.01341
1975280.002940.0586060.0971150.0004680.0334360.018525
1976290.0078240.0707370.1092470.0002420.047420.023542
1977300.0131450.0830630.1215710.0007330.063270.029048
1978310.0190190.0957320.1342360.0007890.0807090.03485

Figures 5, 6, and 7 and Table 4 displayed that the new model has higher prediction accuracy compared with the other models in the literatures. Therefore, it can be used to forecast the actual oil and gas production.

4. Conclusions

(1) Based on the analysis of the cumulative production growth curve model and the Taylor expansion of the model, once the appropriate expansion order n is selected, a new model for the prediction of cumulative production is established. Furthermore, the error of the new model is discussed, and the model can theoretically achieve any given precision.

(2) The analysis of examples of the new model shows that the prediction error gets smaller; the correlation coefficient between predicted and practical data becomes closer to 1 with the increases of the order n. Therefore, in order to meet the requirements of accuracy, an appropriate order n should be selected as far as possible. Because of the machine error of computers, the accuracy of prediction may be not ideal with larger order n.

(3) Compared with other models in the literatures, the results indicate that the model has higher prediction accuracy. It can be applied to forecast the production of oil and gas fields.

Appendix

See Tables 5, 6, 7, 8, 9, and 10.

Abbreviations

G&H model:Gompertz model and the Herbert model
T model:Taylor expansion model
L model:logistic model.

Data Availability

The data used to support the findings of this study are available from the corresponding author upon request.

Conflicts of Interest

The authors declare that they have no conflicts of interest.

Authors’ Contributions

Xianfeng Ding and Dan Qu conceived and designed the study. Xianfeng Ding performed the MATLAB experiments. Haiyan Qiu wrote the paper. Xianfeng Ding and Dan Qu reviewed and edited the manuscript. All authors read and approved the manuscript.

Acknowledgments

At the point of finishing this paper, the authors would like to express their sincere thanks to all those who have lent them hands in the course of my writing this paper. First of all, they would like to take this opportunity to show their sincere gratitude to the supervisor, Mr. Xianfeng Ding, who has given so much useful advices on the writing and has tried his best to improve the paper. Secondly, they would like to express their gratitude to their classmates who offered them references and information on time. Without their help, it would have been much harder to finish this paper.

References

  1. J. J. Arps, “Analysis of decline curies,” SPE-G, 1945. View at: Google Scholar
  2. J. J. Arps, “Estimation of primary oil reserves,” SPE 627-G, 1956. View at: Google Scholar
  3. R. W. Gentry, “Decline-curve analysis,” SPE 3365-PA, 1972. View at: Google Scholar
  4. M. J. Fetkovich, “Decline curve analysis using type curves,” SPE 4629-PA, 1980. View at: Google Scholar
  5. Y. C. Chen, “The derivation and application of Weng's prediction model,” Research Institute of Petroleum Exploration and Development of CNPC, vol. 16, no. 2, pp. 22–26, 1996. View at: Google Scholar
  6. Y. D. Hu, “Exponential distribution and inverse tangential distribution of production decline,” Applied Mathematics & Information Sciences, vol. 24, no. 6, pp. 76–81, 1997. View at: Google Scholar
  7. Q. T. Yu, “A new decline curve,” Petroleum Exploration and Development, vol. 26, no. 3, pp. 72–75, 1999. View at: Google Scholar
  8. C. Z. Song and X. J. Ma, “Generalized Weibull, Wengcycle model for predicting oil and gas production,” Mineral Rock, vol. 20, no. 2, pp. 37-38, 2000. View at: Google Scholar
  9. C. L. Li, S. G. Han, and L. S. Cheng, “Research on a new production decline curve,” Journal of Southwest Petroleum Institute, vol. 25, no. 5, pp. 31–33, 2003. View at: Google Scholar
  10. X. F. Ding and Z. B. Liu, “A new model for oil and gas production prediction,” Petroleum Exploration and Development, vol. 31, no. 3, pp. 104–106, 2004. View at: Google Scholar
  11. Y. J. Zhu and W. J. Gao, “Establishment and research of a new generalized production decline equation,” Fault Block Oil and Gas Fields, vol. 12, no. 6, pp. 47–49, 2005. View at: Google Scholar
  12. J. M. Yao, Y. U. Bing-Song, and C. B. Che, “Application of modified GM model in prediction of oil production in Tarim Basin,” Petroleum Geology and development in Daqing, vol. 26, no. 1, pp. 92–96, 2007. View at: Google Scholar
  13. F. Zhou, “History matching and production prediction of a horizontal coalbed methane well,” Journal of Petroleum Science and Engineering, no. 10, pp. 96-97, 2012. View at: Publisher Site | Google Scholar
  14. K. Li and R. N. Horne, “Comparison and verification of production prediction models,” Journal of Petroleum Science and Engineering, vol. 55, no. 3-4, pp. 213–220, 2007. View at: Publisher Site | Google Scholar
  15. X. Li, C. W. Chan, and H. H. Nguyen, “Application of the Neural Decision Tree approach for prediction of petroleum production,” Journal of Petroleum Science and Engineering, vol. 104, pp. 11–16, 2013. View at: Publisher Site | Google Scholar
  16. T. A. Saraiva, A. Szklo, A. F. P. Lucena, and M. F. Chavez-Rodriguez, “Forecasting Brazil's crude oil production using a multi-Hubbert model variant,” Fuel, vol. 115, pp. 24–31, 2014. View at: Publisher Site | Google Scholar
  17. R. R. Charpentier and T. A. Cook, “Improved USGS methodology for assessing continuous petroleum resources using analogs,” US Geological Survey Open-File Report, vol. 1309, no. 27, 2010. View at: Google Scholar
  18. W. W. Weiss, R. S. Balch, and B. A. Stubbs, “How artificial intelligence methods can forecast oil production,” SPE-75143-MS, 2002. View at: Publisher Site | Google Scholar
  19. T. Insperger, “On the approximation of delayed systems by Taylor series expansion,” Journal of Computational and Nonlinear Dynamics, vol. 10, no. 2, Article ID 024503, 2015. View at: Google Scholar
  20. H. Min, W. Jia, Y. Zhao, W. Zuo, H. Ling, and Y. Luo, “LATE: a level-set method based on local approximation of Taylor expansion for segmenting intensity inhomogeneous images,” IEEE Transactions on Image Processing, vol. 27, no. 10, pp. 5016–5031, 2018. View at: Publisher Site | Google Scholar | MathSciNet
  21. W. Yonthanthum, A. Rattana, and M. Razzaghi, “An approximate method for solving fractional optimal control problems by the hybrid of block-pulse functions and Taylor polynomials,” Optimal Control Applications and Methods, vol. 39, no. 3, pp. 873–887, 2018. View at: Publisher Site | Google Scholar | MathSciNet
  22. A. Nadh, J. Samuel, A. Sharma, S. Aniruddhan, and R. K. Ganti, “A Taylor Series Approximation of Self-Interference Channel in Full-Duplex Radios,” IEEE Transactions on Wireless Communications, vol. 16, no. 7, pp. 4304–4316, 2017. View at: Publisher Site | Google Scholar
  23. S.-J. Lee, M.-C. Kang, K.-H. Uhm, and S.-J. Ko, “An edge-guided image interpolation method using Taylor series approximation,” IEEE Transactions on Consumer Electronics, vol. 62, no. 2, pp. 159–165, 2016. View at: Publisher Site | Google Scholar
  24. Y. Q. Chen, J. G. Hu, and D. J. Zhang, “Derivation of logistic model and its self-regression method,” Xinjiang Petroleum Geology, vol. 17, no. 2, pp. 150–155, 1996. View at: Google Scholar
  25. J. G. Hu, D. J. Zhang, and Y. Q. Chen, “A model investigation on forecasting the production of oil and gas field,” Natural Gas Industry, vol. 17, no. 5, pp. 31–34, 1997. View at: Google Scholar
  26. Q. T. Yu, “A current formula of generalized increase and decline curves for predicting oilfield development indexes,” Petroleum Exploration and Development, vol. 27, no. 1, pp. 50–53, 2000. View at: Google Scholar
  27. J. G. Hu and Y. Q. Chen, “A simple model for predicting oil and gas field production,” China Offshore Oil and Gas, vol. 9, no. 1, pp. 53–59, 1995. View at: Google Scholar
  28. T. Ji, S. Lu, M. Tang et al., “Application of BP neural network model in fracturing productivity prediction of fuyu tight oil reservoir in jilin oilfield,” Acta Geologica Sinica, vol. 89, no. s1, pp. 154-155, 2015. View at: Publisher Site | Google Scholar

Copyright © 2018 Xianfeng Ding et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

545 Views | 247 Downloads | 1 Citation
 PDF  Download Citation  Citation
 Download other formatsMore
 Order printed copiesOrder

We are committed to sharing findings related to COVID-19 as quickly and safely as possible. Any author submitting a COVID-19 paper should notify us at help@hindawi.com to ensure their research is fast-tracked and made available on a preprint server as soon as possible. We will be providing unlimited waivers of publication charges for accepted articles related to COVID-19.